Tweed Terrace Futuristic Home
Construction is now well underway with GCB doing a great job on site, the formwork has now been set for the roof shell concrete pour.
Stay tuned for more photos soon.

A photo from May 2017 showing the bottom half of the concrete pod shell.

July 2017 – roof shell formwork ready for concrete pour.

July 2017 – roof shell formwork ready for concrete pour.

July 2017 – roof shell formwork ready for concrete pour.